Browse PIP Practices

Review the most up-to-date collection of PIP Practices. Most recently published practices are listed first. Search key terms or filter by discipline to narrow the list.
Found 764 Results
Icon for I/E
I/E
PCSPS010

Small, General Purpose Packaged Equipment Instrumentation Specification – PCSPS010 was renumbered and withdrawn April 2024 and its contents incorporated into PCSPK010.

Abstract ↓

This Practice provides the minimum requirements for the performance, design, fabrication, testing, and inspection of instrumentation and control systems installed on small, general purpose packaged equipment units.

​This Practice is not intended for packaged analyzers systems or for safety-instrumented systems (SIS). For instrumentation associated with larger, more complex equipment packages, see PIP PCSPS001.

August 2017
Technical Revision
Icon for Piping
Piping
PN12LB0M01

Piping Material Specification 12LB0M01 175 PSI, Ductile Iron, Mechanical Joints, Cement-Mortar Lined Fire Water (UL Listed or FM Approved) (Underground). To be replaced by PN1FLB0M01 meeting current FM class specifications.

Abstract ↓

​Piping Material Specification 12LB0M01 175 PSI, Ductile Iron, Mechanical Joints, Cement-Mortar Lined Fire Water (UL Listed or FM Approved) (Underground)

May 2017
Complete Revision
Icon for I/E
I/E
PCEGN554

Process Control Systems – PCEGN554 was withdrawn April 2023.

Abstract ↓

This Practice addresses the processes required to successfully implement Process Control Systems for refinery and petrochemical services. This Practice is divided into three parts, each focusing on a major aspect of Process Control Systems:
  • Part 1: Process Control System Functions and Functional Specifications, covers the basic functions that a Process Control System may need to perform, and describes recommended methodologies for determining the functional and integration requirements for a particular application.
  • Part 2: Process Control System Design, covers the hardware and software applied to Process Control Systems and provides recommendations for implementation. Design considerations and references to design practices for control centers and other control system buildings and enclosures are also provided.
  • Part 3: Process Control System Project Execution and Ownership, covers project organization, skills and work processes required to execute a process control project and then to own and operate a Process Control System.

December 2016
Reaffirmation
Icon for I/E
I/E
ELSPF01D

Data Sheet for Medium-Voltage Metal-Enclosed Power Factor Correction Capacitor Specification from 2.4 kV to 35 kV – ELSPF01D was withdrawn in November 2016 and its contents incorporated into ELSPF01.

Abstract ↓

This Data Sheet Practice provides requirements for the design and fabrication of medium-voltage metal- enclosed power factor correction capacitors.<?

November 2016
New Practice
Icon for CSA
CSA
CVS02005

Topographic and Plant Surveys Specification

Abstract ↓

​This Practice in conjunction with <em>PIP CVS02005-F - Survey Checklist </em> describes the requirements for quality control, permits, deliverables, and execution for topographic and plant surveys. In case of conflict, the Survey Checklist supersedes this Practice.

April 2016
Complete Revision
Icon for I/E
I/E
ELSTR01D

Data Sheet for Liquid-Immersed Substation Power Transformers 34.5 kV and below, 500 kVA through 15,000 kVA – ELSTR01D was withdrawn in April 2016 and its contents incorporated into ELSTR01.

Abstract ↓

This data sheet was withdrawn in March 2016 and its contents incorporated into PIP ELSTR01 - Design and Fabrication of Liquid-Immersed Substation Power Transformers, 750 kVA and Above, Three Phase.

April 2016
Complete Revision
Icon for Piping
Piping
PNSMV065

Miscellaneous Metals Check Valve Descriptions was withdrawn Feb 2017

Abstract ↓

This document provides the detailed descriptions for the purchase of check valves included in PIP Piping Line Class Material Specifications.

March 2016
Complete Revision
Icon for CSA
CSA
CVS02010

Geotechnical Engineering Investigation Specification

Abstract ↓

This Practice describes the minimum requirements for a geotechnical engineering investigation including subsurface exploration, field and laboratory testing, analyses, and preparation of reports that present geotechnical engineering recommendations for design and construction.
This Practice does not include requirements for an environmentally-related investigation or analysis.

March 2016
Complete Revision
Icon for I/E
I/E
ELSWC03D

Data Sheet for 600-Volt Power and Control Cable Specification – ELSWC03D was withdrawn in March 2016 and its contents incorporated into ELSWC03.

Abstract ↓

​Data Sheet for 600-Volt Power and Control Cable Specification was withdrawn in March 2016 and its contents incorporated into PIP ELSWC03 - 600 Volt Power and Control Cable Specification.

March 2016
Complete Revision
Icon for I/E
I/E
ELSAP11D

ELSAP11D – Data Sheet for Flooded-Cell Lead-Acid Batteries was withdrawn in January 2024 and its contents incorporated into ELSAP11-Design and Fabrication of Flooded-Cell Lead-Acid Batteries

January 2016
Complete Revision
Icon for I/E
I/E
ELSSG03D

ELSSG03D Data Sheet for Medium Voltage Metal-Enclosed Load Interrupter Switchgear was withdrawn in March 2024 and its contents incorporated into PIP ELSSG03 – Design and Fabrication of Medium Voltage Metal-Enclosed Load Interrupter Switchgear

Abstract ↓

ELSSG03D Data Sheet for Medium Voltage Metal-Enclosed Load Interrupter Switchgear was withdrawn in March 2024 and its contents incorporated into PIP ELSSG03 - Design and Fabrication of Medium Voltage Metal-Enclosed Load Interrupter Switchgear

January 2016
Complete Revision
Icon for I/E
I/E
PCEPA001

Process Analyzer System Engineering Guidelines – PCEPA001 was withdrawn September 2015.

Abstract ↓

This Practice supplements the International Electrotechnical Commission (IEC) Technical Report TR 61831, On- Line Analyzer Systems � Guide to Design and Installation. Together this Practice and IEC TR61831 provide guidelines for the design and installation of process analyzer systems. This Practice describes additions, changes, and deletions that have been made to IEC TR61831.

January 2016
Complete Revision
Icon for Data Management
Data Management
DMDDC002

Transmittal Letter Preparation Requirements – Was Withdrawn 2025 and incorpated into PIP PEEPJ009 – Transmittal Letter Preparation Guideline

Abstract ↓

​This Practice provides the minimum requirements for preparation of a transmittal letter for exchange of technical documents based on one sender to one recipient. This Practice provides pre-defined values that describe the reason documents are created and exchanged. The Practice also provides pre-defined values for the approval status of documents.

October 2015
Technical Revision
Icon for I/E
I/E
ELSAP04D

Data Sheet for Uninterruptible Power Supply (UPS) System – ELSAP04D was withdrawn in September 2020 and its contents incorporated into ELSAP04.

Abstract ↓

This data sheet describe the minimum requirements for design, fabrication, inspection, testing, shipment, and documentation for a complete on-line, UPS system of either a pulse width modulated (PWM) or ferroresonant type, as discussed in ELSAP04 -Uninterruptible Power Supply (UPS) System Specification.

October 2015
Complete Revision
Icon for I/E
I/E
ELSWC05D

Data Sheet for 300-Volt Instrumentation Tray Cable Specification – ELSWC05D was withdrawn February 2020 and its contents incorporated into ELSWC05.

Abstract ↓

​This data sheet provides requirements for manufacturing and testing 300-volt-rated instrumentation tray cable
(Type ITC) as discussed in ELSWC05 - 300-Volt Instrumentation Tray Cable Specification.

April 2015
Reaffirmation with Editorial Revision
Icon for I/E
I/E
ELSGL01D

Data Sheet for Electrical Construction was withdrawn in October 2019 and its contents incorporated into PIP ELSGL01 – Electrical Construction Specification.

Abstract ↓

This data sheet describes the minimum requirements for construction and installation of electrical power and control systems material and equipment, as discussed in ELSGL01 - Electrical Construction Specification.

March 2015
Reaffirmation with Editorial Revision
Icon for CSA
CSA
ARC01015

Architectural and Building Utilities Design Criteria

Abstract ↓

This Practice describes the minimum requirements for the design of buildings. This Practice is intended to be used in conjunction with PIP ARC01016 - Building Data Sheet, PIP CVC01017 - Plant Site Data Sheet, and PIP STC01015 - Structural Design Criteria.
This Practice does not apply to open or partially enclosed industrial structures.

December 2014
Complete Revision
Icon for CSA
CSA
ARC01016

Building Data Sheet

Abstract ↓

This Practice is intended to be used in conjunction with PIP ARC01015 - Architectural and Building Utilities Design Criteria, PIP CVC01017 - Plant Site Data Sheets, and PIP STC01018 - Blast Resistant Building Design Criteria. These data sheets contain architectural, HVAC, electrical, fire protection, plumbing, and communication information that may be conveyed from the owner to the project design team or from the project design team leaders to the team design members. This data may be provided by the owner or developed by the project design team and approved by the owner.

December 2014
Complete Revision
Icon for CSA
CSA
STC01018

Blast Resistant Building Design Criteria

Abstract ↓

This Practice provides structural design criteria for blast resistant buildings.
This Practice describes the minimum requirements for the design of permanent (non-temporary) blast resistant buildings including requirements for selection of structural systems, analysis methods, and design of ancillary items such as doors and openings. This Practice also contains design criteria for non-structural items (e.g., suspended architectural or electrical items, HVAC ductwork, etc.) that could pose a hazard to the occupants of blast resistant buildings.

October 2014
Complete Revision
Icon for I/E
I/E
ELSGS11D

Data Sheet for Low Resistance Neutral Grounding Resistor for 2.4 to 15kV Systems – ELSGS11D was withdrawn in May 2019 and its contents incorporated into ELSGS11.

July 2014
Reaffirmation with Editorial Revision

Date not available
Update type not available

Learn More About PIP Practices

This field is for validation purposes and should be left unchanged.
Name(Required)
Select the document(s) you’d like to download.(Required)