Browse PIP Practices

Review the most up-to-date collection of PIP Practices. Most recently published practices are listed first. Search key terms or filter by discipline to narrow the list.
Found 610 Results
Icon for Process Control
Process Control
PCILI100

Level Transmitter Installation Details

Abstract ↓

​This Practice contains installation details for differential pressure transmitters in liquid level service and includes details for electric or steam tracing of these installations. These details describe the base instrument installations. The bill of material provided with each detail is generic and is complementary to PIP PCSIP001- Instrument Piping and Tubing Systems Specifications.

November 2020
Reaffirmation with Editorial Revision
Icon for Pipeline Systems
Pipeline Systems
PLX01CS1S02

Pipeline Systems ASME B31.8 Material Specification 1CS1S02, Class 150, Carbon Steel, 0.063” C.A., Non-Sour, Design Factor = 0.6

Abstract ↓

​Not applicable

October 2020
New Practice
Icon for Pipeline Systems
Pipeline Systems
PLX03CS1S02

Pipeline Systems ASME B31.8 Material Specification 3CS1S02, Class 300, Carbon Steel, 0.0625” (1/16”) C.A., Non-Sour, Design Factor = 0.6

Abstract ↓

​Not applicable

October 2020
New Practice
Icon for Pipeline Systems
Pipeline Systems
PLX06CS1S02

Pipeline Systems ASME B31.8 Material Specification 6CS1S02, Class 600, Carbon Steel, 0.0625” (1/16”) C.A., Non-Sour, Design Factor = 0.6

Abstract ↓

​Not applicable

October 2020
New Practice
Icon for Pipeline Systems
Pipeline Systems
PLX09CS1S02

Pipeline Systems ASME B31.8 Material Specification 9CS1S02, Class 900, Carbon Steel, 0.0625” (1/16”) C.A., Non-Sour, Design Factor = 0.6

Abstract ↓

​Not applicable

October 2020
New Practice
Icon for Pipeline Systems
Pipeline Systems
PLX15CS1S02

Pipeline Systems ASME B31.8 Material Specification 15CS1S02, Class 1500, Carbon Steel, 0.0625” (1/16”) C.A., Non-Sour*, Design Factor = 0.6

Abstract ↓

​Not applicable

October 2020
New Practice
Icon for Electrical
Electrical
ELSMC21

Medium Voltage AC Adjustable Speed Drives

Abstract ↓

​This Practice describes additions, changes, and deletions that have been made to IEEE 1566-2015. In addition, decisions that have been made regarding options offered by IEEE 1566-2015 are also described.

September 2020
New Practice
Icon for Electrical
Electrical
ELSSG13G

Design and Fabrication of Medium-Voltage Gas Insulated Switchgear up to 52kV (IEC)

Abstract ↓

​This Practice covers the minimum requirements for design, fabrication, inspection, testing, shipment, and documentation for gas insulated switchgear containing gas-insulated buses, power circuit breakers, control, instrumentation, and metering for installation in unclassified areas. This Practice also covers remote monitoring and control requirements.

September 2020
New Practice
Icon for CSA
CSA
CVE02020

Liquid Containment Pits Design Guide

Abstract ↓

​This Practice provides design considerations to engineers designing liquid containment pits, holding ponds, and basins. It includes civil, geotechnical, and hydrological engineering aspects, specifically addressing pits lined with geomembranes.

August 2020
New Practice
Icon for Process Control
Process Control
PCCEL001

Instrumentation Electrical Design Criteria

Abstract ↓

This Practice provides requirements for electrical design for instrumentation.

This Practice describes the requirements for equipment selection, system design, and installation of electrical supply and wiring to support instrumentation for process measurement and control systems. Both US and international standards are referenced in this document. The user should select the appropriate standards according to the geographical location and regulatory agencies.


June 2020
Technical Revision
Icon for Process Control
Process Control
PCIDP100

Differential Pressure Transmitter Installation Details

Abstract ↓

​This Practice contains differential pressure installation details, including liquid, gas, and steam services and includes details for electric or steam tracing of these transmitters. These details describe the base instrument installations. The bill of material provided with each detail is generic and is complementary to PIP PCSIP001 - Instrument Piping and Tubing Systems Specifications.

May 2020
Technical Revision
Icon for Process Control
Process Control
PCIGN100

Instrument Pipe Support Installation Details

Abstract ↓

This Practice provides installation details and describes the minimum requirements for attaching instrument pipe supports to various support structures.


March 2020
Technical Revision
Icon for Machinery
Machinery
REEP006

Pump Selection Guidelines (Universally Applicable)

Abstract ↓

​This Practice describes guidelines for selecting appropriate types of centrifugal and positive displacement pumps for specific process services. This Practice does not cover every pump application or every type of pumping device available.

March 2020
Complete Revision
Icon for Process Control
Process Control
PCITE200

RTD/Thermocouple Installation Details

Abstract ↓

This Practice provides installation details for RTD (Resistance Temperature Detector) and
thermocouples and describes the minimum requirements for installation.


February 2020
Reaffirmation with Editorial Revision
Icon for Electrical
Electrical
ELSWC05

300-Volt Instrumentation Tray Cable Specification

Abstract ↓

This Practice provides requirements for manufacturing and testing 300-volt-rated instrumentation tray cable.

This Practice describes the technical requirements for manufacturing, inspection, testing, and shipping of insulated copper or thermocouple alloy conductor cable for 300-volt-rated multiple conductor instrumentation tray cable in single and multiple pair and triad construction. Pairs or triads may include individual shields and/or an overall shield.


February 2020
Reaffirmation with Editorial Revision
Icon for CSA
CSA
ARS13120

Pre-Engineered Metal Buildings Specification

Abstract ↓

​This Practice provides requirements for design, materials, fabrication, and erection of pre-engineered metal buildings, including exterior doors, windows, louvers and ventilators. This Practice does not include buildings to be designed for blast loads.

January 2020
Complete Revision
Icon for CSA
CSA
STF05521

Angle Guards and Handrails Fabrication Details

Abstract ↓

This Practice provides requirements and details for fabrication of angle guards for walking and
working surfaces and angle guards with pipe handrails for standard stairs used for access and
egress in industrial facilities.


December 2019
Complete Revision
Icon for CSA
CSA
STF05520

Pipe Guards and Handrails Fabrication Details

Abstract ↓

​This Practice provides requirements and details for fabrication of pipe guards for walking and working surfaces and pipe guards with pipe handrails for standard stairs used for access and egress in industrial facilities.

December 2019
Complete Revision
Icon for CSA
CSA
STF05511

Standard Stairs Fabrication Details

Abstract ↓

This Practice provides requirements and details for fabrication of standard stairs for open
structures and miscellaneous platforms and stiles for regular operational access/egress to be used
in process industry facilities.


November 2019
Complete Revision
Icon for Data Management
Data Management
DMDDC001

Document Metadata Requirements

Abstract ↓

This Practice provides the minimum metadata requirements for technical document exchange.

 This Practice establishes the definitions and interpretations for document metadata.

Metadata definitions and interpretations specific to transmittal letters are defined in PIP DMDDC002.

Companies may adopt the Practice for internal use. That is, a company's document-management system may also use the defined metadata identifiers in documents held in the system.


November 2019
Technical Correction