Browse PIP Practices

Review the most up-to-date collection of PIP Practices. Most recently published practices are listed first. Search key terms or filter by discipline to narrow the list.
Found 609 Results
Icon for Electrical
Electrical
ELSWC07

Shielded Power Cable Specification (5 kV to 46 kV)

Abstract ↓

​This Practice provides requirements for the purchase of single and multiple conductor shielded power cable rated at 5 kV to 46 kV. This Practice describes the minimum technical requirements for design, material, construction, inspection, testing, and shipping of solid dielectric, insulated shielded copper cable.​

August 2026
Complete Revision
Icon for Piping
Piping
PNSMV023

Stainless Steel Gate Valve Descriptions

Abstract ↓

​This Practice provides detailed purchase descriptions for stainless steel gate valve tag numbers included in PIP Piping Material Specifications (PMSs) and used along with PIP PNSM0110 and the purchase order for the procurement of valves. This Practice also provides a cross reference for stainless steel gate valve tag numbers to applicable PIP PMSs.​

August 2026
Technical Correction
Icon for Piping
Piping
PN09SK1S01

Piping Material Specification 9SK1S01 Class 900, 321H Stainless Steel, Socket Weld, 0.063″ C.A., Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

July 2026
Complete Revision
Icon for Piping
Piping
PN15SK1S01

Piping Material Specification 15SK1S01 Class 1500, 321H Stainless Steel, Socket Weld, 0.063″ C.A., Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

July 2026
Complete Revision
Icon for Electrical
Electrical
ELIGD000

Grounding Installation Details

Abstract ↓

The purpose of this Practice is to provide the typical details for construction of grounding systems in chemical and refining facilities. The bonding and grounding design and installation shall be in accordance with the National Electrical Code.
These installation details include power system and equipment grounding, static grounding protection for equipment in classified locations, grounding electrode connections, and step and touch potential grounding.
​Not included in the scope of this Practice are computer and control system grounding and cathodic protection.


July 2026
Complete Revision
Icon for Process Control
Process Control
PCIGN300

General Instrument Accessory Details

Abstract ↓

​This Practice contains accessory details that can be added to a pressure or differential pressure transmitter installation detail. Included are seal pot, blowdown, fill tee, rod out, coplanar transmitters, and steam trace supply condensate return details. Instrument purge details are shown in PIP PCIGN200 - General Instrument Purge Details.​

July 2026
Technical Revision
Icon for Piping
Piping
PNSMV047

Plastic and Plastic-Lined Butterfly Valve Descriptions

Abstract ↓

​This Practice provides detailed purchase descriptions for plastic and plastic-lined butterfly valve tag numbers included in PIP Piping Material Specifications (PMSs) and used along with PIP PNSM0110 and the purchase order for the procurement of valves. This Practice also provides a cross reference for plastic and plastic-lined butterfly valve tag numbers to applicable PIP PMSs.​

July 2026
Technical Revision
Icon for Electrical
Electrical
ELSMC13

Low-Voltage Motor Control Centers

Abstract ↓

​This Practice describes the requirements for the design, fabrication, inspection, testing, and shipping of factory-assembled 600 V motor control centers. It includes requirements for buses, enclosures, motor starters, fused switches, and circuit breakers. All equipment described in this Practice is suitable for use in dry, nonclassified areas or in outdoor enclosures. Panelboards and adjustable speed drives are outside the scope of this Practice​.

July 2026
Complete Revision
Icon for Electrical
Electrical
ELSGL01

Electrical Construction Specification

Abstract ↓

​This Practice provides the minimum requirements for construction and installation of electrical power and control systems material and equipment.​​

June 2026
Complete Revision
Icon for Coatings
Coatings
CTSU1200

Application of Underground Coatings for Transmission Pipelines (Universally Applicable)

Abstract ↓

​This Practice provides minimum requirements for surface preparation and the application and inspection of shop-applied and field-applied protective coatings on pipe, field joints, and special fabrications intended for underground/buried service for transmission pipelines.​

June 2026
New Practice
Icon for Coatings
Coatings
CTSL1000

Application of Internal Linings (Universally Applicable)

Abstract ↓

​This Practice provides requirements for installing industrial linings. This Practice describes the general requirements for surface preparation, environmental control, and the installation and inspection of liquid-applied internal linings to metal substrates. This Practice does not cover sheet linings and application of linings to piping.​​

June 2026
Reaffirmation
Icon for Electrical
Electrical
ELEGL01

Overall Electrical One-Line Diagram Drafting Guideline

Abstract ↓

​This Practice is a guideline for developing Overall Electrical One-Line Diagrams (OEOLDs) by engineers and designers. It covers the generation of new OEOLDs and may not apply to the revision of existing OEOLDs. This Practice applies to one-line diagrams that fit the definition of an OEOLD in Section 3. This Practice uses ANSI/IEEE 315 - IEEE Graphic Symbols for Electrical and Electronics Diagrams and IEEE C57.12.80 - IEEE Standard Terminology for Power and Distribution Transformer symbols. The guidelines in this Practice provide a balance between showing all data on OEOLDs and making OEOLDs legible and easy to read. Although this Practice describes major components in the electrical system, specific applications may require additional or alternative components. Determinations concerning fitness for purpose and matters of application of the Practice to a particular project or engineering situation should not be made solely on the information contained in this Practice. The OEOLD symbols included in the Appendices of this Practice are not intended to recommend specific design details or requirements. An example OEOLD is included to provide an illustration of how the elements of this Practice are combined into an OEOLD.​​

June 2026
Complete Revision
Icon for Work Processes
Work Processes
ADG003

Specification for PIP Editors

Abstract ↓

​This document describes the methods used by PIP Editor(s) for editing and managing the production of PIP Practices. Included in the scope are details about template components (e.g., Practice styles and Practice formatting) for each Practice category. Word usage guidelines are also included.

The audience for this document is PIP Editors. Detailed style and formatting information (e.g., font size and line or paragraph spacing) is provided for PIP Editors and does not apply to the PIP Bare Bones template used by member teams.

This document also describes process management procedures, including the review and approval of Practice drafts, communication between the PIP Office and PIP Function Teams, and the steps involved in Practice development and publication such as tracking, reporting, and archiving.

The included information supplements and should be used in conjunction with PIP ADG001, PIP ADG004, PIP ADG005, PIP ADG006, and PIP ADG010.​

June 2026
Complete Revision
Icon for Process Control
Process Control
PCEDO001

Guidelines for Control Systems Documentation

Abstract ↓

​This Practice provides control systems design personnel with guidelines for providing control systems documentation. This Practice describes the general guidelines for control systems documentation for design, supply, installation, checkout or commissioning, and maintenance of instrumentation and control systems.​

June 2026
Technical Revision
Icon for Process Control
Process Control
PCFTE100

Thermowell Fabrication Details

Abstract ↓

​This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells​.

June 2026
Technical Revision
Icon for Electrical
Electrical
ELSWC03

Low Voltage Multiconductor Power and Control Cable Specification

Abstract ↓

​This Practice provides requirements for low voltage power and control tray cable (Type TC) and metal-clad (Type MC) cable. This Practice describes the minimum technical requirements for fabrication, inspection, testing, and shipping of insulated copper cable. This Practice covers low voltage multiple conductor power and control tray cable and metal-clad cable.​

June 2026
Complete Revision
Icon for Work Processes
Work Processes
ADG006

Specification for Revising Practices

Abstract ↓

​This Practice provides the procedures for making revisions and updates to existing Process Industry Practices (Practices). This Practice describes all types of revisions to existing Practices, including the handling and solicitation of comments, the revision cycle, the numbering, the formatting of revisions, and the balloting and approval process for revisions, as well as notification and distribution of revisions. A flow chart that summarizes the revision processes is shown in Appendix A.​


June 2026
Editorial Correction
Icon for Electrical
Electrical
ELTFT02

Induction Motor Electrical Maintenance

Abstract ↓

​This Practice covers minimum requirements for the maintenance of induction motors. The aspects of electrical maintenance are described. While many of the maintenance aspects covered in this Practice can be applied to synchronous and DC motor maintenance, synchronous and DC motor maintenance is not part of this Practice.

May 2026
Complete Revision
Icon for Electrical
Electrical
ELSSG13

Design and Fabrication of Medium-Voltage Gas-Insulated Switchgear up to 52kV

Abstract ↓

​This Practice covers the minimum requirements for design, fabrication, inspection, testing, shipment, and documentation for gas insulated switchgear containing gas-insulated buses, power circuit breakers, control, instrumentation, and metering for installation in unclassified areas. This Practice also covers remote monitoring and control requirements​.

May 2026
Complete Revision
Icon for Electrical
Electrical
ELIMTG00

Motor Installation Details for Class I, Division 2; Class II, Division 2; and Unclassified Areas

Abstract ↓

​This Practice details the requirements for installing circuits for power and control to AC squirrel cage induction motors (600 Volts and below) located in Class I, Division 2 areas; in Class II, Division 2 areas; and in unclassified areas. This Practice describes the basic assumptions used in developing these details and provides guidelines for their use.
Motor installation details are arranged in four major groups as follows:
a. Above grade circuits in conduit
b. Above grade circuits in Cable Tray
c. Below grade circuits in conduit
d. Underground MC cable
Each major group of details contains details as follows:
a. Combined power and control wiring in a common raceway
b. Separate raceways for power wiring and for control wiring
c. Power circuits only
d. Control circuits only
Installation details for the following areas are excluded from the scope of this Practice:
a. Installation in Class I, Division 2, Group A areas
b. Metal-clad cable installation in Class II, Division 2, Group E areas​

May 2026
Complete Revision

Learn More About PIP Practices

This field is for validation purposes and should be left unchanged.
Name(Required)
Select the document(s) you’d like to download.(Required)