Practices by Discipline
PIP produces broadly applicable code-compliant practices.
Browse PIP Practices
Review the most up-to-date collection of PIP Practices. Most recently published practices are listed first. Search key terms or filter by discipline to narrow the list.
Found 606 Results
Mechanical
VECQ1001
Pressure Vessel Shop Qualification Procedure (Universally Applicable)
Abstract ↓
This Practice describes procedures for shop qualification of manufacturers of shop-built pressure vessels, tanks, and heat exchangers in general accordance with the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1 or 2. This Practice may also be used to qualify shops in accordance with foreign or other US codes, but the references given in this Practice are intended for ASME Code construction. This Practice does not include qualification of field-erected tank manufacturers.
August 2024
Reaffirmation
Reaffirmation
Mechanical
VEFTA100
Tank Miscellaneous Details (Universally Applicable)
Abstract ↓
This Practice provides fabrication and installation details for well pipes and other miscellaneous tank components. This Practice describes typical fabrication and installation requirements for well pipes, generally constructed of carbon steel, stainless steel, or aluminum components. These well pipes may be used for measuring levels and temperatures, for liquid inlet, for liquid pump-out, for recycle loops, and/or for content sampling in tanks. This Practice provides details for removable and nonremovable well pipe installations. This Practice also provides details for well pipe supports and other components. Unless otherwise noted, flanges refer to ASME B16.5.
August 2024
Technical Revision
Technical Revision
Piping
PNE00002
Piping Material Specification Selection, Development, and Application Guideline
Abstract ↓
This Practice provides guidelines for the selection, development, and application of Piping Material Specifications (PMSs) and applicable standards for the design of piping systems in the conveyance of gas, liquid, and vapor process and utility streams to ASME B31.3, Process Piping, and ASME B31.1, Power Piping, hereinafter referred to as the Code(s) for the process industry.
August 2024
Complete Revision
Complete Revision
Process
PEEPJ003
Project Estimating (Universally Applicable)
Abstract ↓
This Practice defines the process of initiation and development of cost estimates for projects to ensure consistency and predictability of delivered projects. It provides key elements of the estimating process to enable the project team to deliver an estimate of a quality sufficient to match the agreed expectations between owner and project team. The process outlined covers initiation through establishment of final approved estimate, which becomes the project baseline budget. The cost estimate for a capital project is critically important to all stakeholders. Owners rely on cost estimates to validate the viability of a project’s return on investments through economic analysis. Engineering and construction companies utilize the cost estimate for developing their proposals and negotiating, which are key to securing work and ensuring their profitability. This Practice does not address the subject of cost control of the baselined project budget. The terms “project estimating” and “cost estimating” are used interchangeably.
August 2024
New Practice
New Practice
Piping
PNFJ8000
Jacketed Piping Fabrication and Installation Details
Abstract ↓
This Practice describes the requirements for the design, material selection, fabrication, installation, inspection, and testing of jacketed piping systems. This practice is not a substitute for competent engineering analysis and design based on specific requirements of each project. Engineering should work with an experienced jacketed piping vendor to validate proposed system design and fabrication details.
July 2024
Complete Revision
Complete Revision
Mechanical
RFSB1000
Refractory Brick Material Specification (Universally Applicable)
Abstract ↓
This Practice describes the requirements for certification and prequalification of the refractory materials used to construct refractory brick (firebrick) linings in equipment and piping. It specifies a basis for selection, purchase, and quality control of firebrick and mortar refractory materials prior to installation. This Practice describes material properties, testing, documentation, storage, packaging, and shipping requirements for refractory materials used to construct firebrick refractory linings in equipment and piping. This Practice includes dense firebrick, insulating firebrick (IFB), and refractory mortars.
July 2024
Reaffirmation
Reaffirmation
Process
PHF14SA0E01
Hygienic Process for Food/Beverage/Consumer and CGMP Products Tubing Material Specification F14SA0E01; 304/304L Stainless Steel, C.A.-None, Ramax 32µin (0.81 µm) ID Finish, FKM Seals Construction: Buttweld and Hygienic Clamped Unions
Abstract ↓
Not applicable
July 2024
New Practice
New Practice
Process
PHF14SD0E01
Hygienic Process for Food/Beverage/Consumer and CGMP Products Tubing Material Specification F14SD0E01; 316/316L Stainless Steel, C.A.-None, Ramax 32µin (0.81 µm) ID Finish, FKM Seals Construction: Buttweld and Hygienic Clamped Unions
Abstract ↓
Not applicable
July 2024
New Practice
New Practice
Process
PHF14SA0E03
Hygienic Process for Food/Beverage/Consumer and CGMP Products Tubing Material Specification F14SA0E03; 304/304L Stainless Steel, C.A.-None, Ramax 32µin (0.81 µm) ID Finish, PTFE Seals Construction: Buttweld and Hygienic Clamped Unions
Abstract ↓
Not applicable
July 2024
New Practice
New Practice
Process
PHF14SD0E03
Hygienic Process for Food/Beverage/Consumer and CGMP Products Tubing Material Specification F14SD0E03; 316/316L Stainless Steel, C.A.-None, Ramax 32µin (0.81 µm) ID Finish, PTFE Seals Construction: Buttweld and Hygienic Clamped Unions
Abstract ↓
Not applicable
July 2024
New Practice
New Practice
Process
PHSMV022
Hygienic Process for Food/Beverage/Consumer & CGMP Products Stainless Steel Diaphragm Valve Descriptions
Abstract ↓
This Practice provides requirements for suppliers providing hygienic stainless steel diaphragm valves included in PIP Piping Line Class Material Specifications. For the purposes of this practice, “Hygienic,” Process,” or “Hygienic Process” refers to all Hygienic Processes for Food/Beverage/Consumer & Current Good Manufacturing Practices (CGMP) or other products requiring a clean design.
July 2024
Complete Revision
Complete Revision
Mechanical
VESBI002
Design and Fabrication of Bulk Solids Product Containers (Universally Applicable)
Abstract ↓
This Practice provides requirements for the construction of cylindrical, atmospheric and low-pressure, welded, shop-fabricated or field-erected dry bulk solids bins, hoppers, silos, and gravity blenders. This Practice describes requirements for design, materials, fabrication, examination, testing, and shipping for cylindrical shell, single-wall containers for dry bulk solids having internal design pressures not exceeding 103 kPa (15 psig) and/or full vacuum external pressure at the top of the container in its normal operating position. Containers may be welded, shop-fabricated or field-erected, and shall generally be designed in accordance with the philosophy and requirements of the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, although inspections and marking are not required for these containers.
July 2024
Technical Revision
Technical Revision
Mechanical
VEDBI003
Documentation Requirements for Bulk Solids Product Containers (Universally Applicable)
Abstract ↓
This Practice provides data forms and the associated instructions for specifying requirements for cylindrical, atmospheric and low-pressure, welded, shop-fabricated or field-fabricated dry bulk solids bins, hoppers, silos, and gravity blenders with internal design pressures not greater than 103 kPa (15 psig) and/or full vacuum external pressure at the top of the container in its normal operating position. Containers may be welded, shop-fabricated or field-fabricated, and generally in accordance with the philosophy and requirements of the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1. This Practice is used with PIP VECBI001 and PIP VESBI002 to specify requirements for the design and fabrication of bulk solids containers.
July 2024
Complete Revision
Complete Revision
I/E
ELSMT01G
IEC AC Squirrel Cage Induction Motor Spec. (1000 Volts and Below)
Abstract ↓
This Practice describes the requirements for design, construction, and testing for motors in accordance with IEC requirements for horizontal or vertical, polyphase squirrel cage induction motors that are 1000 volts and below. This Practice covers motors that are totally enclosed fan-cooled (IC 411) type, premium efficiency IE3, air cooled, with IP 54 degree of protection for motors and auxiliaries, and with IP 55 degree of protection for bearing housing and terminal boxes.
July 2024
Complete Revision
Complete Revision
I/E
PCCCS001
Guideline for Designing Industrial Cybersecurity
Abstract ↓
This Practice describes guidelines and background information for the selection, design, and operation of cybersecurity countermeasures in Industrial Control Systems (ICS). Also included is guidance for connection to enterprise systems, hardware selection criteria, software selection criteria, ancillary equipment requirements, and testing of ICS cybersecurity. General guidance related to cybersecurity for industrial control networks is addressed in this Practice in addition to covering allowable communication with external systems and securing communications between ICS and external networks. Building controls systems, enterprise systems, and other business-related operational technology systems are considered out of scope. This Practice also does not cover ICS cybersecurity risk assessment.
July 2024
New Practice
New Practice
Mechanical
RFTB1000
Refractory Brick Installation Qualification, Inspection, and Testing (Universally Applicable)
Abstract ↓
This Practice provides requirements for quality control and quality assurance for the installation of refractory brick (firebrick). Inspection methods include documentation review, in-progress installation inspection, and final inspection of the completed lining.
July 2024
Reaffirmation
Reaffirmation
I/E
ELSGS01
Design and Fabrication of High-Resistance Grounding System (1000 volts or below)
Abstract ↓
This Practice and the purchaser’s data sheet, PIP ELSGS01-D, define minimum requirements for design, fabrication, testing, and documentation of 1000-volts class, three-phase, high-resistance grounding systems installed in non-classified areas.
July 2024
Complete Revision
Complete Revision
