Browse PIP Practices

Review the most up-to-date collection of PIP Practices. Most recently published practices are listed first. Search key terms or filter by discipline to narrow the list.
Found 606 Results
Icon for I/E
I/E
ELEGL01

Overall Electrical One-Line Diagram Drafting Guideline

Abstract ↓

This Practice is a guideline for developing Overall Electrical One-Line Diagrams (OEOLDs) by engineers and designers. It covers the generation of new OEOLDs and may not apply to the revision of existing OEOLDs. This Practice applies to one-line diagrams that fit the definition of an OEOLD in Section 3. This Practice uses ANSI/IEEE 315 - IEEE Graphic Symbols for Electrical and Electronics Diagrams and IEEE C57.12.80 - IEEE Standard Terminology for Power and Distribution Transformer symbols. The guidelines in this Practice provide a balance between showing all data on OEOLDs and making OEOLDs legible and easy to read. Although this Practice describes major components in the electrical system, specific applications may require additional or alternative components. Determinations concerning fitness for purpose and matters of application of the Practice to a particular project or engineering situation should not be made solely on the information contained in this Practice. The OEOLD symbols included in the Appendices of this Practice are not intended to recommend specific design details or requirements. An example OEOLD is included to provide an illustration of how the elements of this Practice are combined into an OEOLD.​​

June 2026
Complete Revision
Icon for Data Management
Data Management
ADG003

Specification for PIP Editors

Abstract ↓

This document describes the methods used by PIP Editor(s) for editing and managing the production of PIP Practices. Included in the scope are details about template components (e.g., Practice styles and Practice formatting) for each Practice category. Word usage guidelines are also included.

The audience for this document is PIP Editors. Detailed style and formatting information (e.g., font size and line or paragraph spacing) is provided for PIP Editors and does not apply to the PIP Bare Bones template used by member teams.

This document also describes process management procedures, including the review and approval of Practice drafts, communication between the PIP Office and PIP Function Teams, and the steps involved in Practice development and publication such as tracking, reporting, and archiving.

The included information supplements and should be used in conjunction with PIP ADG001, PIP ADG004, PIP ADG005, PIP ADG006, and PIP ADG010.

June 2026
Complete Revision
Icon for I/E
I/E
PCEDO001

Guidelines for Control Systems Documentation

Abstract ↓

This Practice provides control systems design personnel with guidelines for providing control systems documentation. This Practice describes the general guidelines for control systems documentation for design, supply, installation, checkout or commissioning, and maintenance of instrumentation and control systems.

June 2026
Technical Revision
Icon for I/E
I/E
PCFTE100

Thermowell Fabrication Details

Abstract ↓

This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells​.

June 2026
Technical Revision
Icon for I/E
I/E
ELSWC03

Low Voltage Multiconductor Power and Control Cable Specification

Abstract ↓

This Practice provides requirements for low voltage power and control tray cable (Type TC) and metal-clad (Type MC) cable. This Practice describes the minimum technical requirements for fabrication, inspection, testing, and shipping of insulated copper cable. This Practice covers low voltage multiple conductor power and control tray cable and metal-clad cable.

June 2026
Complete Revision
Icon for Data Management
Data Management
ADG006

Specification for Revising Practices

Abstract ↓

​This Practice provides the procedures for making revisions and updates to existing Process Industry Practices (Practices). This Practice describes all types of revisions to existing Practices, including the handling and solicitation of comments, the revision cycle, the numbering, the formatting of revisions, and the balloting and approval process for revisions, as well as notification and distribution of revisions. A flow chart that summarizes the revision processes is shown in Appendix A.


June 2026
Editorial Correction
Icon for I/E
I/E
ELTFT02

Induction Motor Electrical Maintenance

Abstract ↓

This Practice covers minimum requirements for the maintenance of induction motors. The aspects of electrical maintenance are described. While many of the maintenance aspects covered in this Practice can be applied to synchronous and DC motor maintenance, synchronous and DC motor maintenance is not part of this Practice.

May 2026
Complete Revision
Icon for I/E
I/E
ELSSG13

Design and Fabrication of Medium-Voltage Gas-Insulated Switchgear up to 52kV

Abstract ↓

​This Practice covers the minimum requirements for design, fabrication, inspection, testing, shipment, and documentation for gas insulated switchgear containing gas-insulated buses, power circuit breakers, control, instrumentation, and metering for installation in unclassified areas. This Practice also covers remote monitoring and control requirements​.

May 2026
Complete Revision
Icon for I/E
I/E
ELIMTG00

Motor Installation Details for Class I, Division 2; Class II, Division 2; and Unclassified Areas

Abstract ↓

​This Practice details the requirements for installing circuits for power and control to AC squirrel cage induction motors (600 Volts and below) located in Class I, Division 2 areas; in Class II, Division 2 areas; and in unclassified areas. This Practice describes the basic assumptions used in developing these details and provides guidelines for their use.
Motor installation details are arranged in four major groups as follows:
a. Above grade circuits in conduit
b. Above grade circuits in Cable Tray
c. Below grade circuits in conduit
d. Underground MC cable
Each major group of details contains details as follows:
a. Combined power and control wiring in a common raceway
b. Separate raceways for power wiring and for control wiring
c. Power circuits only
d. Control circuits only
Installation details for the following areas are excluded from the scope of this Practice:
a. Installation in Class I, Division 2, Group A areas
b. Metal-clad cable installation in Class II, Division 2, Group E areas​

May 2026
Complete Revision
Icon for I/E
I/E
ELTFT05

Switchgear Maintenance

Abstract ↓

This Practice covers minimum requirements for the maintenance of switchgear. While the maintenance procedures herein can be applied to all types of switchgear, manufacturer instructions should be reviewed for equipment specific maintenance requirements.

This Practice does not cover the calibration, settings, or programming of protective devices such as circuit breakers, protective relays, etc.

May 2026
Complete Revision
Icon for Process
Process
PIC001

Piping and Instrumentation Diagram Documentation Criteria (Universally Applicable)

Abstract ↓

This Practice provides requirements for designers preparing Piping and Instrumentation Diagrams (P&IDs). This Practice describes the requirements for P&ID format and content. The Practice is independent of time in a facility life cycle and encompasses design, construction, operations, and maintenance. This Practice covers the generation of new P&IDs and does not apply to the revision of existing P&IDs. This Practice also applies to P&IDs provided by packaged equipment vendors. This Practice applies to all diagrams that fit the definition of a P&ID in Section 3. The requirements provided in this Practice can be applied to any CAD system used for developing the P&IDs and are not vendor, hardware, or software specific. This practice uses US Customary units of measure for drafting dimensions. Line weights are also given in metric units. Current PIP experience is that symbol sizes and drafting dimensions are often based on US Customary units even if the project design and labeling is in metric units. All drafting dimensions could be stated in metric units at the discretion of the user. The requirements provided in this Practice provide a balance between showing all data on P&IDs and making P&IDs legible and easy to read. Process-specific overlays may be developed to define necessary additional requirements or exceptions. The example P&IDs included in the appendixes of this Practice are not intended to recommend specific design details or requirements. Example P&IDs are included to provide an illustration of how the elements of this Practice are combined into a P&ID. Electronic native files for the text, symbols, and legend sheets are available to PIP Member Companies for input into members’ CAD systems. Development of project-specific legend sheets is recommended using the PIP native files as a starting point. Additions and/or deletions are allowed to meet requirements. Legend sheet borders and title blocks can be altered. Development of P&IDs has historically been led by the petrochemical, oil and gas, and specialty chemical industries. Though applicable to all industries, guidelines and practices have primarily focused on these industries. In this revision, we have expanded the scope to include information specific to developing P&IDs for the hygienic processing industries – pharmaceutical, food, and beverage. Though Sections 2, 3 and 4 contain requirements for P&IDs across all industries, Appendix D contains content specific to the hygienic processing industry that supplements or replaces content in Sections 2, 3 and 4. If PIP membership grows to include other industries, it is anticipated that this Practice will expand to have sections on developing P&IDs for the mining, power, pulp and paper, and other industries.​

May 2026
Technical Revision
Icon for Piping
Piping
PN01CS1B02

Piping Material Specification 1CS1B02 Class 150, Carbon Steel, Butt Weld, 0.063” C.A., Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

May 2026
Complete Revision
Icon for Piping
Piping
PN03CS1B01

Piping Material Specification 3CS1B01 Class 300, Carbon Steel, Butt Weld, 0.063″ C.A., Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

May 2026
Complete Revision
Icon for Piping
Piping
PN03CS2B01

Piping Material Specification 3CS2B01 Class 300, Carbon Steel, Butt Weld, 0.125” C.A., Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

May 2026
Complete Revision
Icon for I/E
I/E
ELEGL05

Lightning and Static Protection Guideline

Abstract ↓

This Practice addresses lightning and static protection for facilities that process, manufacture, store, and handle flammable, nonflammable, combustible, and noncombustible products and materials. This practice will also address lightning and static protection of the electrical infrastructure used to support the manufacturing of these materials.

May 2026
Complete Revision
Icon for Process
Process
PIE001

Process Flow Diagram Documentation Guideline (Universally Applicable)

Abstract ↓

This Practice provides general guidelines for the development of Process Flow Diagrams (PFDs) for process and utility systems. This Practice covers the development of new PFDs and does not apply to existing PFDs developed before the adoption of this Practice. The Practice applies to all diagrams that fit the definition of a PFD in Section 3. This Practice can be applied to any CAD (computer aided design) system used for developing PFDs and is not vendor-, hardware-, or software-specific. Although this Practice provides general guidelines for the development of PFDs, individual applications may require differing approaches than those recommended in this Practice. Determinations concerning fitness for purpose and matters of application of the Practice to a particular project or engineering situation should not be made solely on the information contained in this Practice. Example PFDs in the appendixes of this Practice are not intended to recommend specific design details or requirements but are included to provide illustrations of various options available to the user.


May 2026
Reaffirmation
Icon for Piping
Piping
PNSMV007

Carbon Steel Butterfly Valve Descriptions

Abstract ↓

​This Practice provides the detailed purchase descriptions for carbon steel butterfly valve tag numbers included in PIP Piping Material Specifications (PMSs). This Practice also provides a cross reference for carbon steel butterfly valve tag numbers to applicable PIP PMSs. Procurement of valves shall include the detailed purchase descriptions given in this Practice, along with the requirements in PIP PNSM0110 and the purchase order.​

May 2026
Complete Revision
Icon for Piping
Piping
PN06SK0S01

Piping Material Specification 6SK0S01 Class 600, 321H Stainless Steel, Socket Weld, C.A. – None, Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

May 2026
Complete Revision
Icon for Piping
Piping
PN09SK0S01

Piping Material Specification 9SK0S01 Class 900, 321H Stainless Steel, Socket Weld, C.A. – None, Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

May 2026
Complete Revision
Icon for Piping
Piping
PN15SK0S01

Piping Material Specification 15SK0S01 Class 1500, 321H Stainless Steel, Socket Weld, C.A. – None, Elevated Temperature Fluid Service, Process

Abstract ↓

​NA

May 2026
Complete Revision

Date not available
Update type not available